FIELD WORK

We would like to invite you fieldwork which will be held in Küçükçekmece-Karaburun (construction planned Canal İstanbul) route between 08.00-18.00 on Saturday, June 22, 2019.


Departure Time and Location: 08:00 Vezneciler (IU Faculty of Science Garden)
Participation Fee: 30 TL.


Note: Since the number of participants is limited to 75 people, the participation list will be made according to the application priority. 


Route: Vezneciler - Yenikapı - Sahil Yolu – Küçükçekmece - Sazlıbosna Mah. - Durusu Mah. - Karaburun - Küçükçekmece - Vezneciler:
- K.Çekmece Lake shore line
- K.Çekmece Lake
- Sazlıdere
- The entrance of Yarimburgaz Cave
- Sazlıdere Dam
- Baruthane and Baruthane Dam
- Terkos Lake
- Istanbul Airport (IGA)
- Yavuz Sultan Selim Bridge and connection roads
- Old Coal mine fields
- Kanal Istanbul Project
- Karaburun.


Congress Field Study Coordinators:

İsmet Akova, İstanbul University Department of Geography
Ahmet ERTEK, President of Turkish Geography Institute
Mesut SÜZER, ENKA College Geography Teacher, Turkish Geography Institute